Our view

Before deciding which quote offers better value, put the deliverables, limits and responsibilities side by side. That gives you a useful comparison and helps avoid discovering an extra cost when the submission deadline is approaching.

By Bid Flow · 8 October 2026 · 4 min read

Give each provider the same brief

Send the tender questions, scoring criteria, response limits and submission instructions together. Include the deadline, the number of lots you want to bid for and a clear description of what already exists. If you have a rough draft, say how complete it is and whether its facts have been checked.

Tell the provider what you want back. This might be edited answers, a new response, a brochure style PDF or a presentation. If the buyer requires its own template or portal fields, include that requirement. A useful quote should explain how the agreed deliverable fits your submission process.

Look at both the word limit and the question limit

The number of words is only part of the workload. Twelve short questions can require information from more people than three longer answers. A mobilisation response may need input from operations, recruitment and finance before drafting can start.

Bid Flow currently offers the following tender packages. Both limits apply, and each package covers one tender and one lot.

Scroll sideways to read the full table.

PackagePrice shownDrafted wordsScored questionsRevisions
Quick£500Up to 2,000Up to 51
Standard£800Up to 5,000Up to 121
Premium£1,250Up to 9,000Up to 202

For example, a response requiring 1,800 drafted words across eight scored questions exceeds the Quick question limit. Looking only at the word count would point you towards the wrong package. Check the current package details and confirm scope before buying.

Ask what happens when evidence is missing

A writer can organise your information and identify gaps. They cannot truthfully create a contract history, qualification or performance record that your business does not have.

Ask whether the quote includes an evidence checklist and how questions will be raised. Agree who will provide staff information, approve delivery commitments and check commercial assumptions. Where an answer depends on missing information, find out whether that section will remain flagged until you supply it.

This matters when comparing a cheap initial fee with a more complete service. If you still need to spend several days assembling the material, allow for that time in your plan.

Separate revisions from additional work

A revision allowance needs a shared meaning. Correcting wording within the original brief is different from adding another lot, responding to new questions or redesigning the delivery model.

Before accepting a quote, ask how feedback should be supplied, what counts as one revision and how changes to the brief are priced. Check the service terms as well as the package summary. Consolidating comments from your team into one agreed response helps avoid contradictory instructions and repeated changes.

Confirm the design and submission responsibilities

Check whether the fee includes formatting, a designed PDF, editable files or presentation slides. These deliverables are not interchangeable. A slide deck may help at an interview, but it will not replace answers required in a procurement portal.

Bid Flow packages include a bespoke brochure style bid in PDF. Presentation decks are a separate optional service. You remain responsible for approving the facts, pricing and commitments, and for submitting the tender through the buyer's required route.

Agree a delivery date with review time built in

Work backwards from the buyer's deadline. Allow time for your team to check the first draft, provide consolidated feedback and complete the upload process. Ask when the provider needs your essential information and what happens if it arrives late.

At Bid Flow, scope and a delivery date are confirmed before work starts. Payment alone does not confirm that an urgent deadline can be met. If time is tight, discuss the deadline before paying.

Is a fixed fee always the best option

A fixed fee can make budgeting easier when the work is well defined. Its usefulness depends on clear inclusions and exclusions. Compare what you receive, the time your team must contribute and the process for handling changes.

Can I pay for help with a draft I have already written

Yes. Bid Flow can refine an existing draft within an agreed package and scope. Share the draft and tender instructions so the work can be assessed. Our bid review and editing service explains the starting point.

Choose support that matches the work

Start with the questions, response limits and deadline. Then compare Bid Flow's tender packages against the work you actually need. A clear brief makes it easier to choose the right support and keep the project moving.